Equipment for Antimony Extraction by Slurry Electrolysis

  • Audited Supplier
  • 4 yrs

Contact Supplier

Product Highlights

  • Slurry Electrolysis Technology: Combines leaching, separation, and electrolysis to save over 50% energy.
  • High Metal Recovery Rate: Achieves selective leaching and extraction with simplified process.
  • Customized Equipment Design: Furnace tailored to specific production needs and environmental conditions.
  • Comprehensive Technical Support: Includes design, drawings, installation, debugging, and worker training.
  • CE and ISO Certified: Products meet international standards with double testing before shipping.
  • 3-5 Year Warranty: Covers mechanical defects excluding irrational operation and consumables.
  • Fast Delivery for Standard Models: Conventional models ready in 3 days, customized in 35 days.
  • OEM and ODM Services: Flexible customization from samples, designs, or full specifications.

Product Images of Equipment for Antimony Extraction by Slurry Electrolysis

Equipment for Antimony Extraction by Slurry Electrolysis
Equipment for Antimony Extraction by Slurry Electrolysis pictures & photos
Equipment for Antimony Extraction by Slurry Electrolysis
Equipment for Antimony Extraction by Slurry Electrolysis pictures & photos
Equipment for Antimony Extraction by Slurry Electrolysis
Equipment for Antimony Extraction by Slurry Electrolysis pictures & photos
Equipment for Antimony Extraction by Slurry Electrolysis
Equipment for Antimony Extraction by Slurry Electrolysis pictures & photos
Equipment for Antimony Extraction by Slurry Electrolysis
Equipment for Antimony Extraction by Slurry Electrolysis pictures & photos
Equipment for Antimony Extraction by Slurry Electrolysis
Equipment for Antimony Extraction by Slurry Electrolysis pictures & photos
Equipment for Antimony Extraction by Slurry Electrolysis
  • Equipment for Antimony Extraction by Slurry Electrolysis
  • Equipment for Antimony Extraction by Slurry Electrolysis
    Equipment for Antimony Extraction by Slurry Electrolysis
  • Equipment for Antimony Extraction by Slurry Electrolysis
    Equipment for Antimony Extraction by Slurry Electrolysis
  • Equipment for Antimony Extraction by Slurry Electrolysis
    Equipment for Antimony Extraction by Slurry Electrolysis
  • Equipment for Antimony Extraction by Slurry Electrolysis
    Equipment for Antimony Extraction by Slurry Electrolysis
  • Equipment for Antimony Extraction by Slurry Electrolysis
    Equipment for Antimony Extraction by Slurry Electrolysis
  • Equipment for Antimony Extraction by Slurry Electrolysis
    Equipment for Antimony Extraction by Slurry Electrolysis

Find Similar Products

Product Description

Scientificity of the principle of slurry electrolysis process
Product Description

Traditional non-ferrous metal hydrometallurgy usually consists of three major processes: leaching, liquid-solid separation and solution purification, and electrowinning. Energy is consumed during mineral leaching, and the electrowinning process also consumes a lot of electricity. In particular, the energy consumption of the anode reaction in the electrowinning process is high, and the anode reaction process is not utilized, resulting in high energy consumption and complex processes for the entire process. Taking conventional copper electrowinning as an example, the anode potential of copper is 1.23V and the cell voltage is 2.1V. The energy required for the anode reaction in the copper electrowinning process accounts for more than half of the total power consumption, which is completely wasted. The anode gas precipitation overvoltage is high, and the produced oxygen is vented. If the power consumption of hydrometallurgy is 2400 kWh/ton of copper, then more than 1200 kWh is useless. The cell pressure of zinc electrowinning is generally around 3.3V, of which the anode potential is 1. 8V (including gas evolution overpotential), the anode reaction accounts for more than half of the total energy consumption, and metal sulfides need to undergo oxidation reaction during leaching. To complete the oxidation reaction, energy must be applied or a strong oxidant must be added. Therefore, from the overall perspective of hydrometallurgy, there is a very unreasonable phenomenon, that is, leaching generally requires external energy, while electrolysis wastes 1/2 to 2/3 of the energy. If the energy wasted in the electrolysis process can be used for leaching, it is very ideal from the overall perspective of hydrometallurgy. Combining the three processes of leaching, solid-liquid separation, and electrolysis into one, and directly producing metallic antimony from the ore pulp is a major breakthrough in the extraction of gold by hydrometallurgy.
Model AYT Electrolytic Cell
Material Corrosion-resistant polypropylene plastic
Electrolysis Temperature 40 -60°C
Slot Voltage 2.0-3.0V
Current density 150-250A/m2
capacity Customizable
Slurry electrolysis is a new hydrometallurgical technology developed in the past two decades. It combines the three processes of leaching, solid-liquid separation, solution purification, and electrolysis that are usually included in hydrometallurgy into one. It uses the anodic oxidation reaction of the electrolysis process to leach the ore. Its essence is to replace the anode reaction of the electrolysis process with the leaching reaction of the ore, so that the large amount of energy consumed by the anode reaction in the usual electrolysis process is converted into effective leaching of metals. At the same time, the cell voltage is reduced, the electrolysis power is reduced, and the entire process is greatly simplified. For traditional electrolysis or electrolysis, this is a major change. It not only greatly simplifies the process and has a high metal recovery rate, but also makes full use of energy, good environmental protection, and obvious economic benefits. Due to the different oxidation potentials of different metal sulfides and the different reduction potentials of different metal ions, the physicochemical properties of different metal compounds in a specific medium, such as solubility, also vary greatly. The existence of these differences makes slurry electrolysis able to achieve selective leaching of minerals and selective extraction of metal ions to a certain extent.

Technical Support
1) Equipment design
Furnace will be customized to meet your production needing and environmental condition (maximum ambient temperate, humidity, altitude,etc) .

2) Drawings delivery
Technical drawing will be send to the buyer after geting the deposite, so the buyer can build basic contruction before the furnace arrived.

3) Acceptance check before delivery
a. The supply of the inspection equipment complies with the scope of supply and technical specifications in the technical agreement.
b. Check the mechanical actions of the equipment.

4) Installation & debugging & worker training
a. Cooperate with guidance to check the buyer installation work;
b. Internal and electrical wiring connections between equipment;
c. Site commissioning;, according to the actual equipment adjust to the best state;
d. Direct buyer operating personnel to the correct use of operating equipment;
e. Guidance on site security considerations;
f. To guide the buyer maintenance personnel troubleshooting methods;
g. Provide equipment specification;

5) other related equipment for your casting project, such as aluminum ingot maker, mould for mill balls, continous casting machine, ect.



Workshop Interior View

Equipment for Antimony Extraction by Slurry Electrolysis

Real Shot of Delivery
Equipment for Antimony Extraction by Slurry Electrolysis









Equipment for Antimony Extraction by Slurry Electrolysis


Our Advantage

Equipment for Antimony Extraction by Slurry Electrolysis
Equipment for Antimony Extraction by Slurry Electrolysis

FAQ
Q1: How is your company's product after-sales service system?
A: We have professional pre-sales and after-sales departments and
can respond to you within 8 hours to resolve any technical issues.
Q2: How about the quality guarantee period?
A: 3-5 years, exclude irrationally operating and consumable parts.
Q3: How about your products quality?
A: CE certification available and twice test before shipping.
Q4: What's your delivery time?
A: Conventional model needs 3 days.35 days for customized products
Q5: Are you a manufacturer or a trading company?
A: We are a factory with 10 years experience in the field.

About the Supplier

This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASR265519". Items marked "verified" are certified.

Watch Video
Watch Video
Tai'an Anyutian General Equipment Co., Ltd.
Tai'an Anyutian General Equipment Co., Ltd.
Tai'an Anyutian General Equipment Co., Ltd.
Tai'an Anyutian General Equipment Co., Ltd.
Tai'an Anyutian General Equipment Co., Ltd.
Tai'an Anyutian General Equipment Co., Ltd.
Tai'an Anyutian General Equipment Co., Ltd.
Tai'an Anyutian General Equipment Co., Ltd.

About Our Factory & Business Background

verified Business Type
Trading Company
Address
Taian City, Shandong Province, Tai'an, Shandong, China
verified Plant Area
185 square meters
verified Number of Employees
6
verified Registered Capital
500,000 RMB
verified Terms of Payment
T/T
verified International Commercial Terms(Incoterms)
FOB, CIF, CFR, EXW
verified Average Lead Time
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
verified Nearest Port
Qingdao Port
verified Minimum Order Quantity
1 Set
verified Supply Chain Partners
40

Our Production Capability & Technical Expertise

verified Main Products
Rotary Furnace, Aluminum Ash Rotary Furnace, Rectangular Furnace, Reverberatory Furnace, Tower Furnace, Crucible Furnace, Double Chamber Aluminium Melting Furnace
verified Customization Options
Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
verified ODM Service Available
Yes
verified OEM Service Available
Yes
verified R&D Engineers
1 people

Our Industry Experience & Global Business Record

verified Year of Establishment
2022-03-21
verified Export Year
4 Years
verified Main Markets
Domestic
verified Repeat Buyers Choice
10%~30%
verified Number of Foreign Trading Staff
4
verified Overseas Agent/Branch
No
verified New Products Launched in Last year
No

Our Certifications, Standards & Industry Recognition

verified Cooperated with Fortune 500
No

FAQ

How is your company's product after-sales service system?
We have professional pre-sales and after-sales departments and can respond to you within 8 hours to resolve any technical issues.
How about the quality guarantee period?
3-5 years, exclude irrationally operating and consumable parts.
How about your products quality?
CE certification available and twice test before shipping.
What's your delivery time?
Conventional model needs 3 days.35 days for customized products
Are you a manufacturer or a trading company?
We are a factory with 10 years experience in the field.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now